Follow Us:

Completed Projects

Home Completed Projects Recently Completed Projects

SOME OF OUR RECENTLY COMPLETED  PROJECT REFERENCES

S/N PROJECT NAME ADDRESS NO OF UNITS / SPECIFICATION CLIENT / CONSULTANT STATUS
1   Nnamdi Azikwe International Airport Abuja Client: Federal Airport Authority of Nigeria / China Civil Engineering Construction Corporation Nigeria Ltd                                                       Consultant: Arcaid Consultnts Completed & Awaiting Commissioning
Airport Terminal For Federal Airport Authority of Nigeria FAAN, Abuja                                        (Forty (40) Equipments) 29nos passanger Elevators ranging from 1000kg to 2000kg serving 2s/o to 4s/o @1m/s.                                                                                                                                                 9nos. Escalators ;1000mm step width ;35deg inclination between 5.1 to 2.55 vertical height                                                                                                                                                                 2nos. Autowalks; 1000mm pallet width; 0deg inclination and 23.4m Horizontal Distance.
2 Central Bank of Nigeria, HeadQuaters                                                           {Ninteen (19) Equipments Installed with Destination Control System}                  Central Business District Abuja 16nos Passenger Elevators ranging between 630kg-1600kg, and 1.0m/s -1.6m/s                                                                          2nos Eco 3000 Escalators; 1000mm step width                                                                  1no Dumbwaiter Client: Central Bank of Nigeria                Consultant: Interstate Architects                        Main Contractor: Julius Berger Nieria Plc Completed in 2001
3 Shell Petroleum Development Company, H/Q, Freeman House, Marina                                                 (Four (4) Equipments) Campos Street , Lagos Island ,Lagos 3nos. 1600kg/21p pass Elevators 18s/o; 2.5m/s                                                                              1no. 1600kg/21p Cargo Through-type Elevator 18s/19o; 2.5m/s Client: Shell Petroleum Development Corporation                                                               Consultant: Hull Inspections Completed in 2012
4 Union Bank H/Q, Marina {Seven (7) Equipments Installed with Destination Control System}                  Stallion Plaza , 36 Marina Lagos 7nos. 1150kg/15p Minispace elevators serving 28s/o @ 3.0m/s with Destination Control System Client: Union Bank Nigerian Properties Company Limited                                                                          Consultant: F.A.O. Philips & Associate Completed in 2015
5 UBA Bank Plc Headquaters                                                                                                                     {Fifteen (15) Equipments}                  UBA  House,   57 Marina Lagos 2nos 800kg/10p minispace Cargo Elevators serving 20s/o & 18s/o @ 2.5m/s Client: Afriland Properties                                                       Consultants: Unecon Associates;                                                                                      Ominis Design Completed in 2010
9nos 1600kg/21p passanger elevators serving 19s/o @ 2.5m/s Completed in 2012
1no 800kg/10p monospace VIP elevator 25s/o @ 2.5m/s.                                                                                                     1no 630kg/8p monospace Bullion elevator 2s/o@1m/s.                                                              2nos 630kg/8p monospace car park elevators 4s/o@1m/s Completed in 2015
6 Rivers State Secretariat                                        {Twenty (20) Equipments Installed} Port Harcourt 9nos 900kg/12p passenger elevators serving 8s/o @1.6m/s                                                               5Nos. 1275kg/17p passenger elevators serving 11s/o @ 1.6m/s                                                      6nos 1600kg/21p passenger elevators with 5nos serving 18s/o and 1no 19s/o @2.5m/s Client: Rivers State Government                        (Turnkey Replacement Contract) Completed in 2010
7 New National Assembly,                                    Complex,                              {Twenty-Eight (28) Equipments Installed} 3 Arm Zone Abuja 22nos passenger elevators 1600kg/21p@1.0m/s                                                  4nos panoramic elevators 630kg/8p@1.0m/s                                                                                       2nos passanger Cargo / Service Elevators@1.0m/s Client: Federal Government of Nigeria            Main Contractor: Julius Berger Nigeria Plc Completed in 2007
8 Ibese Dangote Cement Factory                                                                           &                                                                                                                     Obajana Dangote Cement Factory                                               {Five(5) Factory Protected Equipments Installed} Client: Dangote Plc                                                     Main Constractor: Sinoma International Engineering Co Limited Completed in 2015
Ibese ,Ogun 1no 1000kg/13p Minispace elevator serving 3s/o @ 1.6m/s ,60.5m Travel                                                      2nos 2000kg/26p Minispace elevators serving 7s/o @1.6m/s,87.7m Travel
Obajana , Lokoja Kogi 1no 1000kg/13p Minispace elevator serving 3s/o @ 1.6m/s,55m Travel                                                       1nos 2000kg/26p Minispace elevator serving 8s/o @1.6m/s,100.7m Travel
9 Ecowas National Conference Centre                                                        (Two (2) Equipments) 60 Yakubu Gowon Cresent ,Asokoro District Abuja 2nos. 1150kg/15p Passanger elevators, 3s/o @ 1m/s Client: Economy Community of West African States                                                                          Main Contractor: Julius Berger Plc Completed in 2015
10 World Bank Office In Nigeria                                ( One (1) Equipment) Plot 102 , Yakubu Gowon Cresent , Asokoro , Extension , Abuja 1no. 1000kg/13p Monospace passenger elevator, 4s/o @ 1.0m/s Client: International Bank For Reconstruction & Development                                                         (Turnkey Replacement Contract) Completed in 2018